- In Scale Model of the Bridge for System Identification. In: Procedia Engineering, v. 161 ( 2016). (2016):
- (2022): Monitoring and Assessment of Bridge Cable Stays Consisting of Bundles of Fully Locked Coil Ropes. Vorgetragen bei: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022.
- Case study: The Harbor Bridge in Bratislava. In: Structural Concrete, v. 21, n. 6 (Dezember 2020). (2020):