0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Research on two Parameters Control of Walking-Type Incremental Launching Box Girder

 Research on two Parameters Control of Walking-Type Incremental Launching Box Girder
Autor(en): , , ,
Beitrag für IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, veröffentlicht in , S. 1457-1464
DOI: 10.2749/nanjing.2022.1457
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.15 MB

In order to ensure the safe implementation of walking-type incremental launching steel box girder. Taking a simply supported wide steel box girder bridge as an example, this paper analyzes the loca...
Weiterlesen

Bibliografische Angaben

Autor(en): (Nanjing Tech University, Nanjing, China)
(Nanjing Tech University, Nanjing, China)
(Nanjing Tech University, Nanjing, China)
(Nanjing Tech University, Nanjing, China)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Veröffentlicht in:
Seite(n): 1457-1464 Anzahl der Seiten (im PDF): 8
Seite(n): 1457-1464
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/nanjing.2022.1457
Abstrakt:

In order to ensure the safe implementation of walking-type incremental launching steel box girder. Taking a simply supported wide steel box girder bridge as an example, this paper analyzes the local stress of the wide steel box girder with four supporting points of walking pusher, and quantitatively determines the three single parameter related control thresholds of lateral deflection, longitudinal pusher asynchrony and vertical lifting asynchrony that are concerned in the construction. Based on the single parameter control research, the two parameters dynamic control threshold range is proposed. The calculation results show that two parameters analysis provides a more reliable means for walking-type incremental launching construction and is a necessary supplement to the conventional single parameter control.

Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
Lizenz:

Die Urheberrechte (Copyright) für dieses Werk sind rechtlich geschützt. Es darf nicht ohne die Zustimmung des Autors/der Autorin oder Rechteinhabers/-in weiter benutzt werden.